Clonduff GAC
CEM provided complete design and management for the construction of this GAC Facility.
CEM carried out complete project design and advised on contract
documentation. CEM issued all tender documents and carried out the
tender appraisal and award.
documentation. CEM issued all tender documents and carried out the
tender appraisal and award.
CEM carried out hydrology analysis and designed the drainage system
in accordance with the best industry practice and methods.
in accordance with the best industry practice and methods.
CEM ensured that all earthworks were monitored and reconciled with allocations.
Weather hindered works and required additional works methods.
Weather hindered works and required additional works methods.
CEM supervised the placement of vertical stone/sand slit drainage.
These drains collect to a main drain, outfalling to the river.
These drains collect to a main drain, outfalling to the river.
The client added a retaining anchor wall during the construction.
Additional works were required to accommodate the construction and services.
Additional works were required to accommodate the construction and services.
CEM used the Wallingford procedure for the design of the drains, sufficiently
backfilled with clean drainage stone to intercept through flow.
backfilled with clean drainage stone to intercept through flow.
The lighting required 18m lighting columns, with CEM designing the base
CEM managed the re-alignment of water mains, telephone servies and electricity supply
minimising disruption and outages throughout.
CEM managed the re-alignment of water mains, telephone servies and electricity supply
minimising disruption and outages throughout.
CEM designed the works with the requirements and financial brief of the client in mind.
The contract was then awarded to McAvoy Contracts.
The contract was then awarded to McAvoy Contracts.
This project required excavations in close proximity to a road, requiring monitoring
and reporting. The project was designed with future construction activities in mind.
and reporting. The project was designed with future construction activities in mind.
CEM hopes that this facility will be fit for purpose in summer 2011.
This project is planned to be complete within budget.
This project is planned to be complete within budget.
Summary